Master Bath & Suite Renovations

Bathroom Remodeling in Marietta, GA

Your master bathroom should function as a private, durable sanctuary. Havencrest specializes in reimagining cramped, outdated bathrooms into spacious master suites complete with curbless zero-entry walk-in showers, freestanding soaking tubs, and custom double vanities. We install state-of-the-art waterproofing systems, precision-pitched shower pans, and premium plumbing fixtures engineered to protect your home's structural framing for decades. Our Marietta design team helps you balance luxury tile selections with water-efficient fixtures that meet Georgia residential standards.

Master bathroom remodel in Marietta GA with freestanding tub and walk-in shower
Scope of Work

What's Included in Your Bathroom Renovation

From subfloor waterproofing to precision tile mitering, every stage is executed by certified trade professionals.

Marietta Trade Standards

Built to Cobb County residential code

  • Schluter-KERDI waterproof bonded sheet membranes
  • Expert master plumbing and pressure-tested lines
  • Dedicated GFCI circuits and insulated exhaust routing

Layout Updates

Expanding shower footprints, relocating plumbing stacks, and optimizing privacy partitions.

Custom walk-in shower tile installation with frameless glass

Custom Showers & Tubs

Frameless heavy glass enclosures, zero-threshold curbless pans, linear drains, and deep freestanding tubs.

Vanities & Storage

Custom floating or furniture-style double vanities with quartz tops, integrated power, and linen towers.

Precision Tiling

Waterproof Schluter membranes, heated floor systems, and floor-to-ceiling porcelain or natural stone.

Premium Fixtures

Thermostatic multi-head valve systems, rain shower heads, modern brass trim, and quiet ventilation.

Planning & Specifications

Key Decisions You'll Make

Every intentional structural and material selection made today determines how comfortably your bathroom performs for decades.

Shower vs. Tub Layout

Balancing freestanding soaking tubs with expansive walk-in enclosures based on square footage, plumbing pathways, and daily bathing rituals.

Vanity & Custom Storage

Assessing wall-mounted floating vs. furniture-style cabinetry, integrated double basins, custom drawer organizers, and recessed medicine niches.

Tile & Waterproofing

Selecting porcelain, natural stone, or handmade tile paired with uncoupling membranes and comprehensive wet-area tanking systems.

Plumbing Fixtures & Finishes

Specifying thermostatic shower valves, pressure-balanced handshowers, drain assemblies, and coordinated solid brass plumbing hardware.

Accessibility & Longevity

Planning curbless zero-threshold shower entryways, slip-resistant mosaic flooring, and structural wall blocking for concealed grab bar installation.

Also coordinate your whole-home aesthetic if you areplanning a kitchen remodel too

What Drives the Cost of a Bathroom Remodel

Every bathroom investment varies by layout adjustments, structural scope, and material durability rather than room size alone.

Plumbing Relocation
Shifting waste lines, vents, or supply stacks beneath subfloors requires structural adjustments.
Waterproofing Scope
Curbless transitions, continuous membrane liners, and sealed wet-room assemblies demand meticulous prep.
Tile & Stone Selection
Large-format porcelain, handmade ceramics, and natural slabs influence layout cutting and installation time.
Fixture Tier & Valves
Thermostatic valves, concealed rough-ins, and solid-brass trim require specialized mechanical precision.
Comfort Additions
Programmable radiant floor heating and high-CFM quiet ventilation require dedicated electrical runs.

To prepare realistic budgets before opening walls, read our planning guides.

Planning & Execution

What Affects Your Timeline

Transparent scheduling balances rigorous craftsmanship with key municipal milestones from permit filing to final sign-off.

Permitting & Municipal Reviews

Cobb County zoning clearance and building permit processing times dictate initial groundbreak windows.

Fixture & Finish Selection

Early approvals of plumbing hardware, tile, and lighting prevent work stoppages before demo begins.

Custom Fabrication Lead Times

Tailored stone vanities and frameless glass enclosures require precision post-tile templating and multi-week craft milling.

Phased Rough-in & Final Inspections

Timelines account for coordinated municipal sign-offs between trade rough-ins and final occupancy clearances.

Is It Time to Remodel Your Bathroom?

Recognizing when your space no longer serves your daily routine is the first step toward a functional home.

Accessibility and safety

Transition to a zero-threshold shower and slip-resistant flooring for effortless accessibility as your needs evolve.

Dated Marietta homes

Update aging galvanized plumbing, worn fixtures, and vintage tile in classic Cobb County craftsman or colonial properties.

Preparing for resale

Refresh tired cabinetry, worn surfaces, and dim lighting to maximize property appraisal value before listing your home.

Growing household demands

Incorporate a double vanity and dedicated vertical linen storage to relieve crowded morning routines for your family.

Remodeling vs. moving

Stay in the neighborhood you love by expanding your current footprint — and if you're also considering finishing your basement, coordinated renovations keep disruption minimal.

Work Protocol

Our 5-Step Bathroom Remodeling Process

A clear, staged path from initial assessment through plumbing rough-ins and verified punch-list completion.

STEP 01

Consultation & Assessment

We evaluate your current plumbing, electrical capacity, and structural layout on-site while clarifying your spatial goals.

STEP 02

Design & Material Selection

Our team crafts layout plans and guides your selection of durable tiles, vanities, plumbing fixtures, and lighting.

STEP 03

Permitting & Scheduling

We submit building permits to the local jurisdiction, verify building codes, and lock in our trade calendar.

STEP 04

Construction

Crews set up dust containment, install waterproof shower systems, run rough utilities, and complete precision tile installation.

STEP 05

Final Walkthrough & Warranty

We test all fixtures, verify our detailed punch list, and review your written craftsmanship warranty documentation.

Common Questions

Frequently Asked Questions

Essential facts, permit standards, and scheduling expectations for residential renovations in Marietta and Cobb County.

A complete bathroom renovation typically spans three to six weeks depending on the project scope and structural alterations. The process moves through disciplined phases: architectural demolition, rough-in plumbing and electrical installation, subfloor preparation and waterproofing, precision tile setting, cabinetry, and final plumbing trim and fixture installation.

Project Parameters

Investment & Next Steps

Estimated Investment[Price range]

Most Cobb County bathroom renovations are completed within 3 to 5 weeks from demolition to final walkthrough. Because we order all plumbing fixtures, vanities, and tile prior to demo day, work progresses daily without delays for backordered supplies.

3–5 week target completion
Procurement prior to demo
Transparent Pricing

Get Your Bathroom Remodeling Estimate

Detailed scope outlines, verified trade standards, and guaranteed fixed pricing for your Marietta home.

Project Details
Fill in your details below to schedule your consultation and receive a breakdown of remodeling costs.

No obligation. We respect your privacy and will never share your contact information.

Waterproofing and shower construction

Water damage is the costliest bathroom failure, so we focus on what is behind the tile. Walls and floors in wet areas receive a continuous waterproofing membrane, and shower pans are sloped toward the drain with proper flashing at corners and niches. Curbless showers need a recessed floor and careful drain design to keep water contained.

Test the shower pan before tile if possible. A flood test takes a day and can prevent a catastrophic leak later.

Ventilation and moisture control

Georgia humidity makes ventilation essential. Fans should be sized to the room and ducted to the exterior, not into the attic. Quiet fans get used; noisy ones do not. A timer or humidity sensor ensures the fan runs long enough after showers.

Good ventilation protects paint, drywall, cabinetry, and the air in your home.

Layout, storage, and lighting

Plan clearances: thirty inches in front of toilets and fifteen inches from the centerline to side walls are typical minimums. Vanity height of thirty-six inches suits many adults. Storage options include recessed medicine cabinets, tall linen cabinets, and drawers instead of doors.

Layer lighting with fixtures at the mirror, overhead lights, and a night light. Good lighting at the vanity matters more than decorative fixtures.

Accessibility and aging in place

Curbless entries, wider doors, grab-bar blocking, bench seats, handheld showers, and slip-resistant floors make bathrooms safer. These changes are easiest to include while walls are open and can be designed to look stylish rather than institutional.

Even if you do not need them now, adding blocking in the walls costs little and keeps options open.

Tile, fixtures, and finish selections

Large-format porcelain tile has fewer grout lines and is easier to clean. Textured tile on shower floors improves traction. Plumbing fixtures vary widely in quality; look for solid-brass valves and finishes with solid warranties. Matching metal finishes across faucets, lighting, and hardware creates a coordinated look.

Order fixtures early because rough-in valves must match the trim you choose.

Typical bathroom timeline

After demolition, plumbing and electrical rough-in come first, then inspections, waterproofing, tile, vanity, fixtures, and paint. Tile setting and grout cure times are fixed, so rushing them risks failure. Most bathroom remodels run several weeks, depending on scope and material lead times.

We give a projected schedule in your proposal and update it as the project moves.

Cleaning and care

Use non-abrasive cleaners on natural stone and glass, re-caulk joints when they crack, and run the fan after every shower. These small habits prevent mildew and extend the life of the waterproofing and finishes behind the tile.