An open floor plan remodel in Marietta usually means removing or reducing walls between the kitchen, dining and living areas, which requires structural planning and a permit. Havencrest Home Renovations offers a free in-home consultation to help you choose.

Mention code
FREECONSULT when you request your estimate.Open layouts make homes feel bigger, brighter and easier to entertain in. Also, many Marietta houses were built with separate rooms and walls that no longer match how families live, and opening them up is one of the most requested projects we see.
The key question is what the walls are doing. Additionally, some only divide space, while others carry the roof or floor above.
Your options
Full open concept
Removing most walls between kitchen, dining and living creates a single large room. Likewise, it is the most dramatic change and requires beams and careful planning of ducts and wiring.
Partial opening
Similarly, a wide cased opening or a half-wall keeps definition between rooms while sharing light and sight lines.
Pass-through or peninsula
A pass-through window or countertop opening connects the kitchen to the family room with less structural work.
Remove a hallway or closet
Moreover, reclaiming circulation space can improve flow while keeping main walls in place.
What to consider before you decide: open floor plan remodel in marietta
Load-bearing walls
Beams, posts and footings must carry the loads the wall carried before. In fact, a structural review and permit are normal parts of the project.
What is inside the wall
Also, ducts, plumbing stacks and wiring are common and add cost to relocate.
Floors and ceilings
When a wall is removed, flooring and ceiling lines often need patching or replacement to look seamless.
Heating and cooling
Likewise, a larger open room may need different air distribution to stay comfortable.
How this looks in Marietta homes
In Marietta, 1980s and 1990s two-story homes often have a formal dining room and a closed kitchen that are good candidates for opening. Similarly, mid-century ranches may have a central wall with the roof structure above it. Also, we check the framing from the attic or crawlspace before promising a result.
By home age
- Historic homes. Whole-home work in historic houses near the Square often involves plaster repair, original trim, updated wiring and careful coordination so period character stays intact while systems become modern.
- Mid-century homes. Mid-century homes usually benefit from opening the floor plan, updating electrical and plumbing, and replacing windows and flooring in one coordinated project.
- 1990s and 2000s homes. 1990s homes often need a second look at open sightlines, builder-grade finishes, dated lighting and aging mechanical systems. A cohesive plan modernizes the entire house.
- Newer homes. Newer homes typically need finish upgrades and layout refinements instead of structural work, making whole-home projects shorter and more predictable.
What it costs
Every house is different, so the best number is a written estimate. In addition, for planning, these 2025 national benchmarks show typical costs for related whole-home remodeling work and how much returns at resale.
| Project type | Typical national job cost | Resale value | Cost recouped |
|---|---|---|---|
| Minor kitchen remodel, midrange | $28,458 | $32,141 | 112.9% |
| Bath remodel, midrange | $26,138 | $20,915 | 80% |
| Basement remodel | $52,012 | $36,905 | 71% |
Source: Remodeling Magazine 2025 Cost vs. Value Report, national averages. Local pricing varies; your written estimate reflects your own scope.
Mention code
FREECONSULT when you request your estimate.Signs this project is right for you: open floor plan remodel in marietta
You bought an older home that needs everything
When kitchens, baths, flooring and systems are all dated, coordinating one team and schedule avoids conflicting trades and repeated disruption.
The layout no longer fits your life
In fact, opening walls, relocating doors and reworking circulation can transform a house without adding square footage.
You are preparing to sell
Targeted, high-return updates coordinated across the house can improve condition and buyer perception.
Several small projects keep stacking up
Additionally, one coordinated scope with a single schedule is usually more efficient than serial projects.
Systems are aging together
Wiring, plumbing, HVAC and windows reaching the end of life at once makes the case for one planned project.
You want a consistent look throughout
Similarly, flooring, trim, paint and lighting that run continuously make a home feel intentionally designed.
What drives price and schedule
Order of work
Structure and mechanical work come first, then drywall, flooring, cabinets and finishes. In addition, a good sequence prevents damage and rework.
Living in the home or moving out
Some families stay in a finished wing while work proceeds elsewhere. Moreover, others rent temporarily. Moreover, we help you plan either option.
Allowances and selections
Early selection of flooring, cabinets, tile and fixtures keeps the schedule moving and the estimate accurate.
Permits and inspections
Multiple permits may run in parallel. Also, we coordinate them so inspections do not stall progress.
Budget contingency
Older homes can hide surprises. Additionally, a contingency of ten to fifteen percent is a prudent planning figure.
Living with the result
After a whole-home project, build a simple maintenance calendar. Likewise, check caulk and grout each spring, service HVAC before summer, review attic and crawlspace conditions after heavy storms and revisit paint touch-ups in the first year as the house settles.
Keep a record of every product used, from paint colors to cabinet finishes and fixtures. Similarly, a single binder or digital folder makes future repairs and resale disclosures much easier.
Planning tips from our projects: open floor plan remodel in marietta
Decide your order of rooms
Cabinet delivery and plumbing make kitchens and baths the critical path. Schedule flooring, paint and trim for after demolition and rough-in.
Pick finishes in batches
When selections are decided before work begins, trades stay busy and deliveries match the calendar.
Create a living plan
Pick a temporary cooking area and a protected bedroom early, and agree on where you can take calls or work during the day.
Keep a decision log
Ask that every change be documented before work proceeds, and keep photos to track progress and agreements.
Mistakes to avoid
- Starting without final selections, which causes delays and price changes.
- Treating the budget as a single number instead of a range with allowances.
- Not planning where to live during the noisiest phases.
How to budget with confidence
Start with the national benchmark, then adjust for your house. Additionally, add a contingency of ten to fifteen percent for hidden conditions, separate fixed costs such as labor, permits and structure from allowances for items you will choose later and ask every contractor to price the same scope. Moreover, a clear, itemized estimate is worth more than a low total, because it shows exactly what you are paying for and where you have flexibility.
Questions to ask any remodeler
- Is the estimate itemized, with allowances clearly labeled?
- Who is on site day to day, and how are changes priced?
- How are permits and inspections handled?
- What is the payment schedule and what does each payment cover?
- How do you manage dust, noise and clean-up in an occupied home?
How the process works: open floor plan remodel in marietta
- Free in-home consultation
We walk through the whole house with you, listen to priorities and talk through a realistic budget. - Scope and phasing plan
Rooms and systems are grouped into a sensible sequence, with options if you want to phase the work. - Design and selections
Layouts, materials and fixtures are chosen with clear deadlines so orders arrive on time. - Permits and written estimate
Permits are pulled and a detailed estimate is presented with clear allowances. - Construction in phases
Demolition, structure, mechanical, drywall and finishes proceed in order with regular updates. - Final walk-through
We review every room with you and complete a punch list before closing the project.
Whole-home remodels commonly run three to six months, sometimes longer for larger homes or structural changes. Likewise, a detailed schedule is created after selections are finalized, and long-lead items are ordered early.
Frequently asked questions
Can any wall be removed?
No. Similarly, load-bearing walls can be removed only with proper beams and support, and some walls contain mechanical systems that must be rerouted.
Do I need a permit?
Yes, for structural changes. In addition, we handle the drawings and coordination.
How long does it take?
Moreover, opening a wall and finishing the surrounding area can take several weeks, depending on the size of the opening and finishes.
Will I need to replace my flooring?
Often at least some. In fact, we discuss flooring early so transitions look natural.
What does it cost?
Cost depends on structure, utilities and finishes. Also, we provide a written estimate after a free in-home consultation.
How do I get started?
Call (470) 847-9076 or request an estimate online and mention the code FREECONSULT for a free in-home consultation. Additionally, we visit, measure and talk through your goals.
Related pages
Talk with a Marietta remodeler: open floor plan remodel in marietta
Call (470) 847-9076 or request an estimate online. Likewise, use code FREECONSULT for your free in-home consultation.
Getting started with open floor plan remodel in marietta
If you are planning open floor plan remodel in marietta, the first step is a conversation about your goals, your budget and your home. Our team can walk the space, answer your questions and give you a written estimate for open floor plan remodel in marietta with no pressure. For national cost and resale benchmarks to compare against, see the Remodeling Magazine Cost vs. Value Report. Then call (470) 847-9076 and use code FREECONSULT for your free in-home consultation.